Build Map
Tour
Build MapStage 2Function 2.1

Drayage dispatch board & loop builder

Stage 2 · Dispatch & Drayage Operations

P1Core Operations

Four-Lane View

Software Function

  • Chained-leg assignment engine (dray → transload → outbound → empty repo) Chassis/TWIC/UIIA eligibility filtering at assignment time LFD/per-diem clocks on every container; exception surfacing Street-turn matcher (SIA) before empty return

Competitors

PortPro (best-in-class single-leg dray dispatch), Trinium (enterprise depth), DrayNow (ramp marketplace)

Differentiation

They optimize a load. We optimize a tractor’s week — the loop is dispatched as one unit with balance engineered on both sides of the corridor.

Make It Better

First dispatch system where deadhead is a monitored KPI with a target (~10% vs ~30% industry) — because the loop, not the match, is the product.

Role: Driver / Owner-OperatorChapter: ★ Build Map